Gravel Driveway Washing Out in Kountze, TX
Kountze, TX
What to do right now
- Check every crossing on the route before the next trip in. A sag over the pipe, a crack across the road at the crossing, or a hole beside the end of the culvert means the fill may have washed out and the road over it can collapse under a loaded truck. Keep off it until it is opened up. Call 811 before digging near a pipeline marker or a buried line anywhere on the tract.
- Remember or note which sections stopped you last season. Those are the ones to build. A road that is fine in September tells you nothing about January.
- On the sloped stretches, find where the channel starts. That is where water first failed to get off the road, and the first cross drain goes above it.
- Walk the low ground toward the creek after a rain and see how long it stays wet. Those sections need fabric and depth, not a crown.
- Do not have rock spread along the whole route. It goes down the channels on the slopes and into the mud in the bottoms, and neither section is fixed.
A gravel driveway or interior road washing out in Kountze usually fails at the wrong time of year: the route to the stand was pushed through in dry weather with no crown or drainage, and in January, when it is actually used, the sloped upland sections have cut channels and the low ground toward Village Creek has gone to mud. Before the next trip in, look at any crossing over a draw for a sag or a hole beside the pipe, since a crossing that lost its fill in Harvey or Imelda can be hollow under a loaded truck, and call 811 before digging near a marker. TRP Land Clearing & Excavation rebuilds the sections of a Kountze road that fail in season. The estimate is free.
Kountze is the Hardin County seat, twenty-three miles north of us on Highway 69, and the Big Thicket National Preserve headquarters is here. The tracts around it are timber and hunting ground rather than lots, and the driveway that washes out in Kountze is very often not the one to the house. It is the road to the back of the property, the one that has to work in February when the season is on and the ground is at its wettest. That road was usually made by pushing a route through with whatever was on hand, which produces a track: no crown, no ditch, a surface that channels water down its own length on the slopes and sits in it in the bottoms. It works in September. It fails at its actual job. This page is about building the pieces of that road that matter, and leaving the rest alone.
A Road That Works in September and Fails in January Has Failed
Upland Slopes in the Big Thicket Cut, They Do Not Sink
The Bottoms Toward Village Creek and the Crossings
Building the Sections That Fail, Not the Whole Route
When to call a dirt contractor
Call when the road to the back of the tract stranded a truck last season, when a sloped stretch has cut a channel, or when a crossing over a draw has settled or washed since the floods. Call in spring or early summer rather than October, because a road that has to work in the wet months wants building while the ground can still be compacted, and lanes and plots on the same tract run on the same calendar. And call before hauling rock in, since the free walk of the route will show which sections actually need it.
Frequently Asked Questions
Why is the road to the back of my Kountze tract fine in the fall and useless by deer season?
Do the sloped parts of the road through the pines need a deep base?
Can I put a crossing through the creek bottom to shorten the road?
When should a hunting tract road in Hardin County be built?
Gravel driveway washing out or rutting? We cover Kountze.
TRP Land Clearing & Excavation works across Kountze, TX. Call 409-554-2287 or request a callback.
Karl Gillihan, Owner
TRP Land Clearing & Excavation
Updated September 2026