Sabine Pass & Golden Pass, TX
Gravel Lots, Laydown Yards & Erosion Control in Sabine Pass & Golden Pass
TRP Land Clearing & Excavation, based in Beaumont, keeps gravel lots, laydown yards, access roads and eroded edges in working shape at plant and LNG construction sites around Sabine Pass and Golden Pass, at the south end of Jefferson County on Highway 87. The work includes parking lot grading and leveling, base rebuilds under crane mats, gravel top-up in compacted lifts, and rock armoring where runoff or storm surge has cut into lot edges and ditch banks along the Sabine-Neches Waterway. Every job is run by the owner, Karl Gillihan, who holds a TWIC card, OSHA 10 and OSHA 30, and Basic Plus. The site walk and estimate cost nothing.
Sabine Pass sits at the very bottom of Jefferson County, where Highway 87 runs south out of Port Arthur along the Sabine-Neches Waterway and the land flattens out into marsh a few feet above the Gulf of Mexico. LNG construction and operations along the pass bring contractor parking, busing lots, laydown yards and gravel access roads, all of it on low, wet ground close to open water. TRP Land Clearing & Excavation keeps that ground working: gravel lots, parking lot grading and leveling, laydown yard rebuilds, pothole repair and erosion control around Sabine Pass and Golden Pass.
Behind the work is the owner, Karl Gillihan, second generation in logging, farming, land development and heavy equipment, who has worked in and out of Gulf Coast refineries and plants for 15 years. He knows what a gate line at shift change looks like, what a safety orientation covers and how permit-to-work fits around a job. He runs every job himself, from the first walk of the lot to the final compaction pass.
Why gravel lots near the pass sink faster than lots inland
Most of the ground between Port Arthur and the mouth of the Sabine is marsh clay with a water table sitting just under the surface. Where lots and yards have been built up, it is usually with fill hauled in and spread, and fill placed on saturated clay keeps settling for years. Gravel spread on top of that, with nothing between the rock and the clay, gets pushed down under every loaded truck while the wet clay squeezes up into the voids. The lot looks fine the week it is finished and turns soft by the next wet spell.
A lot that lasts here starts below the gravel. Soft and organic material comes out, the subgrade is shaped and compacted, and a separation layer goes down wherever clay would otherwise work up into the rock. Base goes in lifts, each one compacted before the next, and the finished surface is topped with gravel that locks together instead of rolling. On ground this close to sea level, the separation layer is rarely optional. It is usually the difference between a lot you regrade once in a while and a lot you rebuild every year.
Parking lot grading and leveling when the land has almost no fall
The hardest part of grading a parking lot at Sabine Pass is that the land barely slopes at all. Inland, a lot can shed water on a gentle grade toward a ditch. Down here the ditch may sit only a little lower than the lot, the tide and the wind push water back up the drainage, and any low spot in the surface becomes a pond that stays for days after a rain.
So leveling is only half the job. We set the grade so every part of the lot moves water somewhere, whether that is a crown down a drive lane or a steady cross slope toward an inlet or a ditch that actually drains. Where the lot sits too low to drain at all, the answer is to raise it with compacted fill and base rather than keep chasing puddles with more gravel.
Contractor parking and busing lots on this end of Highway 87 take a beating during big construction pushes and turnarounds, then sit quiet between them. The quiet stretch is the time to cut out the ruts, rebuild the soft areas and regrade, so the lot is flat, drained and ready before the next wave of crew trucks and buses arrives.
Laydown yards that hold up under crane mats and heavy lifts
LNG construction brings big equipment, and big equipment needs laydown yards that do not move. On marsh clay, a yard that carries crane mats, pipe spools and material racks for weeks will develop soft spots right where the weight sits. When the mats come up, what is underneath has often sunk into a bowl that holds water and will not support the next load.
We rebuild those areas from the base up. The failed material comes out, the subgrade is recompacted, the base is rebuilt in lifts and the yard is regraded so water leaves the surface instead of collecting under the next set of mats. Where a yard is being laid out new, getting the base depth and the drainage right before any steel shows up costs far less than digging out soft spots with material stacked next to them.
Storm surge, wave wash and eroded edges along the Sabine
Hurricanes have hit this end of the county hard. Rita in 2005 and Ike in 2008 each pushed surge across the low ground around Sabine Pass, and surge does something to a gravel lot that rain does not. Moving water strips the fines out of the base, scours the downstream edge of the lot, washes out culvert ends and leaves a layer of silt behind that has to come off before any repair will bond.
Even without a named storm, the edges take steady punishment. Runoff concentrates at lot corners and cuts channels. Ditch banks next to the waterway slough in after heavy rain. Wind-driven water and wakes along the Sabine-Neches Waterway chew at any exposed bank of clay or fill.
Erosion control here means rebuilding undercut lot edges, laying ditch banks back to a slope the wet clay can hold, resetting culverts at the right flow line, and armoring outfalls, channels and exposed edges with rock sized for the water that will hit them. After a storm, the same work gets a site back in use: clear the silt, find where the base has been scoured, rebuild it and top up the gravel.
Potholes, cart routes and working inside the gate at Sabine Pass
Inside the fence, the small failures matter too. Potholes on gravel access roads, ruts in walkways and washed-out shoulders can trip someone walking, spill a bicycle rider or roll a small utility vehicle. A pothole on a cart route is patched properly with a dig-out: the failed material comes out, the base underneath is rebuilt and compacted, and the drainage that caused it is corrected so the repair does not refill with water. If a road is better paved, TRP brings in a paving partner to lay the mat and keeps the prep, base, drainage, scheduling and cleanup itself, so you still have a single point of contact.
Getting to the work is familiar ground. The owner carries a TWIC card, OSHA 10 and OSHA 30, and Basic Plus, and site orientations and permit-to-work are routine for him. Grading and gravel work involves no hot work. TRP can also work as a subcontractor under an approved contractor's site program, going through that program's onboarding, orientation and paperwork before the first load of rock goes through the gate. Ask us about plant prequalification and paperwork for your site.
Other industrial areas
Port Arthur, TX
Jefferson County
Port Arthur lies along the Sabine-Neches Waterway near Highways 87 and 73.
Beaumont & Nederland, TX
Jefferson County
Beaumont and Nederland sit along the Neches River corridor in Jefferson County.
Orange & Bridge City, TX
Orange County
Orange and Bridge City lie near the Sabine River along Highway 87 in Orange County.
Lake Charles, LA
Calcasieu Parish
Lake Charles sits on the Calcasieu River along Interstate 10 in Calcasieu Parish.
Services for plant sites
Frequently Asked Questions
Why does the gravel in our Sabine Pass lot keep disappearing?
Can you regrade a contractor parking lot on Highway 87 between construction pushes?
What should we do about a lot edge that storm surge or high water scoured out?
Can TRP work at a Sabine Pass site as a sub under our contractor program?
Do you cover the Louisiana side across the pass as well?
Ready to Get Started?
Get a free, no-obligation estimate for your project.
